ARCHIVE
Case Studies
Case Studies 28.07.2020
Transcritical LT booster on WALK-IN structure
After 2 years of operation we are showing you another beautiful plant with SCM Transcritical LT booster on WALK-IN structure
Case Studies 21.07.2020
Full integrated Booster lands in Luxembourg
A Booster full integrated lands in Luxembourg for Delhaize Supermarket Alzingen.
Case Studies 13.07.2020
Full CO2 Transcritical Plant
Ready to be shipped! Full CO2 Transcritical Plant: >2x Transcritical MT Chiller >2x Booster with Chiller Load and LT DX
Case Studies 22.06.2020
Successful installations in APAC countries
A gallery of successful CO2 installations in APAC countries. Thank you Beijer Ref Australia.
Case Studies 21.05.2020
A successful industrial installation in China
A successful industrial installation in China
Case Studies 14.04.2020
A successful industrial installation in Nederland
A successful industrial installation in Nederland
LET'S START
Building Connections
Building Connections
FOLLOW US
On LinkedIn
On LinkedIn